jessie, reno is probably done in aug cos firstly, i've yet to confirm on my ID and i am still shopping around for a ID that i am okie with. Secondly, if i do reno during the lunar 7th month, then those contractors got lesser projects on-hand so dont rush for time...
From what i know ID would help to design and also draw up a more detailed pic for the contractors to be able to visualise the works needed to be done. ID also can help you source for items, like those lamps, taps etc you like but cant find...
ID is definitely more ex, but save time and effort lor... And i personally think that bcos ID comes up with 3D drawings of all the things you want, i have a better idea on what looks good or not.. like previously i really like the idea of having a full height cabinet beside my fridge where i can build in my oven and my microwave.. but after the drawing came up, the kitchen looks super cramped, so i changed the design to make it spacious.. if i jus had gone ahead with to reno according to what i initally feel, then might end up with a cramped looking kitchen.
contractors wise, you must have a clear idea of what you want to do and also go down more often to the site to see the works done.. (if got ID, also need to go site to see see, but not as frequent)...
yukifire, so excited hor?! I'm finally a proud owner of a flat... hee hee...
Btw, my flat faces outside, you??
any other 490ers?