I spent 38K+. Did quite alot of stuff hehe...and i also din use HDB's floor tiles. I changed all of them lor...i even changed the doors except for main door that HDB gave us.
1. Homogeneous tiles for dining area, living room balcony, store room, kitchen,service balcony and 2 bathrooms (the latter 3 areas
include waterproofing). Laying of designed tiles in my foyer.
2. Raised platforms in living area and MBR. To
supply and lay long timber strips for 3 bedrooms and living area. (initially is parquet but supplier sent wrongly so we topped up abit to get long timber strips!)
3. Construct 50mm height kitchen cabinet base.
4. Construct 50mm height fridge base with tiles.
5. Construct 50mm height washer base with tiles.
6. Construct 50mm height shower kerb at 2
bathrooms.
7. Seal up existing toilet door entrance at service balcony & lay with wall tiles at one side of wall & plaster at the other side. A lourve window for common bathroom.
8. Replace copper piping for whole house.
9. Extend sink and washer in/outlet. Connect sink and washer in/outlet.
10. 10mm thick tempered glass shower screen, vanity top with suspended cabinets using laminates, wall to wall mirror and a light box and 10mm thick tempered glass (frosted) glass door at MBR bathroom.
11. 10mm tempered glass casement door, kitchen
cabinets using laminates, glass panel backing, light box above kitchen cabinets at kitchen.
12. Shoe cabinets with sitting bench at foyer.
13. Feature wall with tv console cum foyer partition (full height).
14. Install 32 no. of looping points for lights.
15. Extend SCV and double powerpoints and tel points at living and 2 bedrooms.
16. False ceiling at foyer, living, dining, bedroom passageway.
17. Recessed light holder at MBR and foyer.
18. Hacking of existing floor tiles at kitchen,
service balcony.
19. Whole house painting.
20. Changing of whole house powerpoint/light
switches and some rewiring work.
21. Install windows at service balcony.
22. DVD/VCD cabinet at living room.
23. Study tables (an F shaped with cpu holders) plus wall hung cabinets with external shelvings.
24. Feature wall cum tv console (the latter is foc).
25. One night table and one coffee table.
26. Changing of 3 bedrooms' doors and 1 store room's doors.
My ID absorbed some of the cost for us and also giving me one wall clock foc too. Usually, if she could absorb then she will absorb. Even the long timber strips, she did consider absorbing the topping up for us. But we tot maybe we shd just pay the $500...its also not fair for her to absorb
So we paid and we really like them so much.
And the workmanship is very good! Hehe..alot of ppl came to my hse and said wow, our timber is very nicely done and very worth the money! Where to find so cheap! For 4 rooms leh...as u see our living room's raised platform is almost as big as one bedroom liao. So really lucky for us tat the supplier sent the goods wrongly hehe