Hi Amelia,
to add on wat Milo,Ernie and AK have post above on standard HDB flat...
- kitchen and toilet wall tiles are done
- Kitchen and bathroom flooring(cermanic)are done
(in fact, both toiles are all done up for mine)
- same like AK, all piping/electrical wires are concealed
- standard HDB bedroom doors
- bi-folding PVC toilet door for both toilet
- Shower head for both toilet
- Hot and cold water pipe for both toilet
- Hanging clothes almunimim 'bar'
- Aircon ledge
same here, as milo66 quality of my renovation, I'm not very satisfied with it.
yup WIS is going monthly around 19th or 20th of the month. they are still a lot of flats in the areas such as Sembwang, Jurong West, CCK etc under WIS.for more details, you can check it out at HDB website.