yi jie,
thanks for sharing so much with me via sms last nite.. kekeke...
reno should be completed by this week. hope so lah, coz sunday we have to "xie tu" already and next sunday move our things in. there are always last minute things that crop up. hahaha.. like changing the door below the hob to sliding door, etc. But overall fine, and we are still happy with the works.
So now we are just waiting for the sliding door to be up, the painting to be done the second time and the washing of the floor and the installation of shower curtain rods.
i also have false ceilings at the entrance of the door and between the 3 bedrooms. 1 false ceiling around $100 i think.
Then i added 6 shelvings in the 2 bedrooms.. so that cost me another $600.
And i have a solid wood table at the entrance to pray to "tian gong", so that cost me another $200.
My solid wood shoe cabinet cost me around $960.
My installation of all lightings, electrical works and heater cost me around $730.
I change the toilet doors to sliding doors, cost around $220 per door and change the bedroom doors and each bedroom door around $110.
So the above all raise my original quotation price.. kekekeee...
Hopefully they wash the floor nicely and then i can do more cleaning up over the weekend. in fact i have washed the floor myself but hor, as i wash, 15 mins later the place gets dirty again! So dusty *yucks*