Pass by and here's the update
633D level 5 completed and starting on level 6.
633 C , still doing up the concrete for the ground level
633B started on the supporting beams for ground level,
633A, level 5 in progress
Rental blk i think completing level 10.
The 2 big yellow tanks are lying on their side, ready for removal / relocation. The space for the MSCP is empty soon,`