Hi,
Just to inform u guys I've collected my keys late this afternoon and we are the 57th unit to collect keys. The overall quality of the finishings are generally satisfactory. The marble flooring is slightly uneven between some tiles when u feel with ur fingers. We din notice any cracked tiles in the toilets maybe becos the toilet damn dark altho shine with torchlight. We've submitted our initial defects list to the contractor already but will continue to check some more tomorrow morning when day is brighter.
Also, we felt that our unit appeared smaller than what we thought. Out floor plan said our living room is 3700mm in length but we measured 3400mm. Master bedroom like no space for bed side table leh. Utility area very small, so i think cannot buy big washer.
But very happy with what we saw today, the whole Park Green site is big, bright, windy and looks great.
Will update somemore after tomorrow's follow up checking. Anyway, the contractor said reno can only start after defects are rectified and max is 1 mth.