Thanks for the well wishes everyone, guess will do wat i can and leave the rest to fate. Everyone, from my ID , banker and lawyer are trying to help, except NTUC
We asked Jean who should we put as payee for the cheque / cashier order, she refused to tell us and say it might lead to mistakes, better to wait for notice. So see, want to expedite also cannot
Samily, din know you overseas
Tell you wat,you can email my ID,ask her abt it, or if you wan, can PM me also. Generally, if you are doing more work, such as carpentry, the price difference is not much. But if you are doing very little, for example only false ceiling, electrical and painting, the price difference will be greater becos the project is small and margin is little. Generally, ID do not take such small basic jobs becos design and consultation is involved, and it does not make sense for them economically. My ID is doing the basic package only becos of the economies of scale. So, the conclusion is, if you doing basics, come back and find a contractor. If you doing a bit more, can still talk to my ID hehehe
Btw gals, our Carol has finished shopping and is enjoying her jap meal now