yum> honestly to finish reno within a month is not possible. In fact, normally 2 to 3 mths if they only have "normal" business..
not to say that i'm helping Patrick,(he's not my ID, just partially)..
but from what i gathered(during my reno), things like build-in wardrobe, wood etc.. takes time.. I also think that easy mah, just saw wood and paste on laminate will do.. when i really see how Ah Keong and that fat uncle did at my house, i kept my mouth shut.
They brought all the sawed wood to my place, all different pcs and not mounted or mantle.. no laminate etc.. then started to do everything in my house.. pasted laminate over the wood, saw additional dimension or length, immediately called down their factory to ask for more delivery.. after pasting laminates, they rested.. coz laminates need time to stick.. so done.. so next day, start fixing and mounting the stuff.. all these took a week or so, even polishing the kitchen table top, no signs of connecting pcs.
What i'm saying is every reno/contractor sure have faults.. and for patrick's case, u need to constantly remind him.. and he dun charge things for what he had done wrongly unlike some who claimed they dun charge but add the cost somewhere else..
btw, for those pp who wants to cut cost, patrick's policy is that must have lots of lights whether u use it or not coz to him, is easier to install first, dun use, nevermind.. but when u need additional lightpoints, u may have to incur more coz may have to dismantle false ceiling or L-box etc.. pulling electrical wires also might be difficult.. so just make sure u know what u want and look at the lightppoints first.. light/points could cost up to a few thousands.