ya, I have already told Patrick all my requirements and he has also done the measurement. All my tiles also choosen.
(me veryyy KS, all those things that I want him to install for me, eg. hood, hob, sink, accessories, toilet bowl, basin, etc... I already bought them and now sitting in my bomb shelter... haaa I think Patrick will go crazy when he sees them on Saturday haaa)
According to Patrick, the first thing to start is tiling. And since I requested for the popular Loud Voice uncle
... so he alone will take 3-4 weeks. For carpentary, I will only be doing the kitchen cabinet, some horizontal conceal shelving in 2 of my rooms and also a cabinet in front of my main door. For the design and choosing of exact colors of kitchen cabinet, we will only start talking in detail when we are going to start on that (for me ok lah, no point now tok so much wait got to change and change again.... knowing my "kuan" haaa)
So now, I only left with looking for air-con, buying remaining lightings and I can shake legs liao~~ ..
by the way, I read so much about homogenous tiles will wrap or have sharp edges, or even some will have croudy wax on them .. hai ... worried leh. Anyone of u 'regreted" using homogenous?? alamak, my living/dining/shelter/3bedrooms all using the shiny homogenous tiles leh~~