<FONT COLOR="aa00aa">alex,</FONT>
so u went to see our flat ah? aiya, u can lift up the protection sheet mah.. then can see a bit. i worried too white leh.. hiaz..
our contractor told us kitchen cabinet is up (but hold the sink & hob opening), 1st coat painting done (2nd, 3rd & 4th gotta wait after aircon trunking & capentry up), others on hold.
u install window grilles? hmmm, then must go take a look when it's complete. cos we worried it looks awful (diff to match hdb provided grilles) so not installing at the moment.
paint ur bdrm drs as well! seems like really must pop down to take a look one of these days leh.. then see if can do the same to ours. what color u painted ur walls? most likely will leave the iron door as it is.
did u change ur toilets door? me still hvn't decide.. hiaz.. very fickle-minded!!
oh, can email me ur air-con trunking layout map? thx in advance.
tot of ur qn. (the kitchen top to put rice cooker etc...), that's why i thinking of doing a sliding table top. but hubby like not so interested, & contractor says it's expensive so gave up the idea.
<FONT COLOR="aa00aa">Ann,</FONT>
envy, envy, envy.... can we drop by 1 of these wkends?!
<FONT COLOR="119911">did anyone change their toilet basin(s)? hubby thinking of changing to those glass type.. $360-$400 leh.</FONT>