Hi all,
After i submitted my defect list to HDB, i called my technical officer the next day to arrange for an appointment. It was quite fast on his part (in the end, we didn't have a joint inspection... he inspected the flat on his own).
The part which was difficult was the appointed contractor. Because different parts of the house was done by different contractors like the windows and the tiling are under two different contractors, you have "chase" after each one for rectification.
It has been about one month since I submitted my defect list... So far only the bomb shelter door defect and the kitchen wall tile defect were rectified... The toilet doors (which had rusty knobs), window hinges, main door and letter-box were still left as it was...
However, I informed the "co-ordinating" contractor that I will start my renovation by a certain date. So at one time i had two different groups of contractors working in the same flat.