Sembawang Green BTO sep 06

Hi Piggylover
Thanks for sharing =)

Last Sat, my bf and I drove past the site at nite... rather quiet environment... however the momentum for building seems to slow down... wonder got anything to do with recession cos all raw materials ae so exp now...
 


i think govt has stocked up a lot of raw materials for the upcoming BTOs, so there shouldn't be a prob during these recession period.

some pic to show on the paint progress of 488.

800761.jpg


800762.jpg
 
Hi Edwin
Thanks for the pic... btw, since they starting to paint the blocks already, are the window glass up already? How abt the interior i.e. flooring, doors, piping...
 
Edwin thanks for ur pic!

xiaofeizhu83, yup! the normal procedure shd b aft painting follow by window installation. but not sure if aft completing both will come with flooring, doors. piping hav already been installed during building rite??
 
Great news, Edwin. Can't wait for all the blks to be completed. With the rainy season coming, hope the contractor can still finish 487 by year end.
 
haha...because 488 is the first blk to be built, and it was first had the roof mostly finished.

well, the rest will follow suit. but mostly 487 will still be the last to be painted.haha...
 
ha ha edwin becomes our advisor now :P
oh boy, i cant wait... every now and then i see sales, just cant wait to buy everything and fill up the house.
 
haha... advisor still far from it la. ya lor...now sales everywhere... hopefully by the time our unit come, more sales and more rock the bottom sale. haha... who knows economic crisis, everyone wan to shed price and sell cheap cheap
 
who told u u need to wait for all 4 blocks to paint finish to get keys?

haha.... anyway, in fact after painting, there will be inspection.only after inspection clear, then they will handover the keys to HDB. by that time all paintwork would have finished. and how they distribute the keys is not going to be all at the same time. the first blk once inspection cleared, they will handover the keys. normally keys collection is different date for different blk. in this case normally will be 488 first, then 490 489 and finally 487.
 
They will have to wait till all flats r completed and safe to enter the blocks before they could let out even the first keys...
 
Hi everyone

I'm new here, but have been following thru this forumboard since Aug 08 (hope it's not too late)....really glad to find some fellow sembawang greenies over here...3 cheers for the contributors on the photos & details, you guys are great!

Anyway, can't wait for the flats to be ready next year...keep our finger crossed, cheers!
 
Welcome to Sembawang Green CT! Cheers!

Took some glimpse as I'm reservist this week, can see that blk 487's (think is 487 from the view by the mainroad) roof is still not up yet. the blk beside it is almost done with the painting from the outside view though..
 
This was taken when the sun was setting.. around 6.55 pm. For those who bought Blk 487,unit no 131, do you think we will get the late afternoon sun?
839941.jpg

839942.jpg
 
488 2nd level n 3rd level windows are up... wonder how long more they need to complete the blks. hope 488 get news soon abt completion...
 
Windows for 488 on the outside are mostly up for the bedrooms.... living room still waiting for paint work to be done. looks like its getting closer to completion...

844123.jpg


blk 487

844124.jpg
 
Hi all, just got to know of this thread recently. It's amazing to learn that many of you are very active & passion in keeping close monitoring of the construction progress.
happy.gif
I have selected Blk 489, unit 103.
happy.gif
Thanks for all the pics & updates! Ha..ha...we thot we are the only couple/future Sembawang Green flat owner who go down to the site & take pics of the flats construction progress every 3-6 mths. Hee...hee...now we know we are not alone. :D Very enjoyable journey to see the flats building up. Cheers!
happy.gif
 
Did you guys note that theres additional "shades" outside the windows? Is it for all the units both side or just certain units? Didn't know got the "shades", didn't recall the design have those "shades". I am puzzled.

I wonder how it would look like standing at the entrance of the park looking into in.

Also do you guys think there would be problem with drying our wet clothings?
 
Nic...i shades r for blocking direct sunlight.. if u observe close enuff u realise units facing east and west will have these shades while units not facing directly the these directions will not have these shades...
 


i was looking at the back dated photos posting by Fin...

I only see 490 have those shades outside the windows but not the rest of the blocks. But 490 is not facing East of west right? Or are those shades eventually will be fix on all blocks?



860829.jpg

860830.jpg

860831.jpg

860832.jpg
 