lavend3rmist
New Member
yalor, the temp RT is very slow... N everyone's not actively posting there too, i think i'll stay here for the moment.
ivy: give him some buffer better, he tell me 3wks in the end now 5th wk, i'm still pending some minor rectification to be done.
For my case, Ah soon showed us a tentative drawer for my TV console. The rest was after tiling, then his bro Jason will sit down n draw out the proposed layout. They didn't advise us on the downlights portion, i didn't do cove lightings. Just went to the lights shop and ask how many downlights i need for my living rm space and then just buy.
U spent $4k on toilets+kitchen fittings! Must be very nice nice one lah. Show us pics leh!
If u wanna save on lights, can go to the light shops we went @ Geylang.. i went No.1 lightings, Pet went DK lightings and A lightings. Angel went to Extreme lightings at J.besar and got cheap downlights too.
ivy: give him some buffer better, he tell me 3wks in the end now 5th wk, i'm still pending some minor rectification to be done.
For my case, Ah soon showed us a tentative drawer for my TV console. The rest was after tiling, then his bro Jason will sit down n draw out the proposed layout. They didn't advise us on the downlights portion, i didn't do cove lightings. Just went to the lights shop and ask how many downlights i need for my living rm space and then just buy.
U spent $4k on toilets+kitchen fittings! Must be very nice nice one lah. Show us pics leh!
If u wanna save on lights, can go to the light shops we went @ Geylang.. i went No.1 lightings, Pet went DK lightings and A lightings. Angel went to Extreme lightings at J.besar and got cheap downlights too.