Santa, completion date where will confirm so soon when only the lego walls are completed for 1 out of 4 blocks. The internal wirings, pipings, windows, doors, locks, tiles, painting, etc all to be completed.
THey can take their time, but give me a good job, rather than deliver a unit with leaking joints at the lego walls, leaking pipes or uneven tiles etc... Not forgetting this is a China contructor.