elchwong, snowiee is rite dat i've engaged orange cube as my ID.
shirley, my ID advise me to choose materials only when the reno date draws near so that i'll not forget wat i choose. choose n confirm already means no changing leh. my EA is a premium flat, so all flooring are done n wiring concealed. oni need to choose materials for carpentary n see which electrical pts need to be shifted.
i tink 26feb is impossible for mi to start reno although dats wat my ID has planned. coz the CNY is coming, i dun tink the branch office can complete the rectification on time. today i went my place again. mopped the floor again n wipe the windows+balcony door.
most impt of all, i found more defects today, most of them in the common toilet. i got lots of wall tiles dat all stained with cement. out of the 4 walls in the toilet, 3 walls has accumulated more than 35pcs of cracked wall tiles and some scratched!!! one floor tile behind the big pipe was cracked also and nearby wall tile has grouting problem. now my common toilet looked like full of injury coz i pasted the white masking tap with marking on all the problematic tiles. i wan to request the branch office hack and relay the common toilet wall tiles for me coz the cracked tiles are all over. if juz replace one by one will look ugly lor. even the PVC toilet door is spoilt, the bottom part opened up and wood shavings are dropping out!! will ask them to change a new door also. now my defect list getting longer n longer liao.
thanks Cecilia!
cutecat, i got heard dat two brothers cannot get married in the same yr. i had a classmate who had want to haf her AD in dec, but now changed to next yr coz her bf's elder bro is getting married tis jun