Champions Court @ Woodlands - BTO

Alicia ic..glad to know the new neighbours of same blk here. Too bad i'm slow, only get to discover this champion court recently hehe.

CH, gd to see u here. So coincidence we share the same AD hotel & we'll be neighbour next time :D
 


CH> dragon babies will have high competition for schools and things like that lei. think carefully bah.

then again, babies are like, can wish for but not necessary definitely can happen.
 
CH> Yup, i saw some of ur wedding pics, but i'm interested in ur table top & those 3-in-1 photos. =)

MC Queen> Beta late than never know abt the thread. =)

potat0> So u will be planning after AD too for a dragon baby? =P
 
MC Queen>> yah, is nice to knw u.. n i always rem, u book the date tat i wanted too for AD.. haha.. n u r much earlier than me.. i thought im early liao, bt u r even earlier..haha.. :p

Potato >> yes, agree with u.. babies cannot plan much.. sometimes, the mre u want it, the mre u cant get it..
happy.gif
yah, i knw the competition on dragon babies.. bt well, i wanted to hv a bb after wedding, so to count the date, is dragon bb if we can realy hv a bb few mths after wedding lor..
happy.gif


Alicia>> i dun hv those 'table top, or rather spore bridal shop called it as 8" table top photo'.. mine, instead of 8", my bridal shop in TW gave us a 20" portrait instead..
we dun hv those 3-in-1 type.. we hv a even bigger portrait, 30"... and another poster...

these are the 3 additional ones we hv tat are diff fm spore bridal shop lor..
happy.gif
even our small album is big too.. spore ones really small.. ours is 16" big.. big album is 20"... v big hor.. hehe.. :p
 
Alicia and CH> no plans for bb at the moment. if it comes it comes lor. But really hope not to have a dragon bb though.

The competition and stress will be quite tiring.
 
haha.. for us, we too taking things naturally.. we too nv even tink or plan for a dragon bb.. bt juz so happen tat this yr we are getting married.. if everything goes smoothly, we will wana hv a bb soon.. so it may juz b a dragon bb..haha.
happy.gif
 
btw just for everyone's info. I don't know how it works for the construction firm but at night these days, can see some units got lights though.

For those which are completing the building soon like CH's block, it seems to slow down quite a fair bit already.
 
wow.. interesting leh... got lights in some units..hmm.. means they are doing things inside??

my blk slowing dwn already?? sad... hmm.. bt tink it slows dwn alittle to wait for other blks bah..haha.. :p

hvnt been there these weeks.. duno the progress.. tink shld hv finished up to 16th floor liao bah... shld b doing the roof already bah..
happy.gif
 
CH> Nope. Still at lvl 15 with parts of lvl 16 done only.

No idea about the lights though. I happen to jog pass and saw lights in a few units. Possibly working on it at night. I'm guessing it might be some internal work at night.
 
potato>> u staying ard there?? wow, jog pass there...

hmm.. seems like the progress on my blk indeed slow dwn le.. me expecting it to complete lvl 16 last wk or so.. hmm.. hopefully will b done by nxt wk bah..
happy.gif


bt seems like good news tat few units are hving lightings n doing internal wrk..
happy.gif


interesting sia, work out for ur wedding huh.. hehe.. :p me been working hard to maintain n trying to loose a few mre kgs.. hehe.. :p

me gng for my gown fitting nxt sat.. hehe.. so excited..
happy.gif
 
My second son super hyperactive, haiz im really exhausted every end of the day
sad.gif


My eldest ger is born in the year of dragon 2000 hehe
 
wow.. so she's 11 this yr... wow.. ok ok.. see if i can get a 'xiao long nu' or nt lor.. hehe.. :p

wow... hyperactive, then hard to take care hor.. hmm.. gona take care of urself too.. hehe.. :p
 
update on my wedding preps.. hehe.. juz choosen my AD gowns.. juz love it alot..hehe.. hv wat i wanted.. shiny, long trail wedding gown.. hv a v princessy feel.. hehe.. :p MTM my evening gown.. v nice too.. more of a figure showing Qi Pao..hehe.. modern Qi Pao..hehe. means to say, fm nw till Dec, i will try to maintain my fig or slim dwn mre.. coz if fat, then wouldnt look good in Qi Pao le..hehe. :p
 
Updates on CC..my blk is nw building the roof le..doing on the water tamk le..sooo excited..was ard tat area yest..hope to see mre things done up jn the nxt few mths..
 
Was ard our CC today... saw tat they are testing the lightings at the corridor of the blks of flats near the JC le,... n some workers are fixing up the pippings of those blks there at the higher level le.. so hapi with their progress... !! jia you.. faster complete.. hehe.. :p
 
hello all future neighbours,
hope im not too late to join u all for discussion.
happy.gif


how's the progress? have been awhile i dint pass by and see look.

btw, mine is 570C. :D
 
Phyllis> Ya! Hahha! Everytime when there's an update, ppl will post it there so that all of us can openly discuss. =) Good way of bonding before we shift in too! ^^
 
Phyllis> HAhaha! Ya man! But now HDB alr shifted our Probable Completion Date from 4th Qtr 2012 to 3rd Qtr 2012, so most ppl say can expect it ard 2nd Qtr 2012.
 
Hello people/future neighbors!

I'm new here.. applied 3rooms flat at Woodlands Champion Court!

Always inspect at the site once a month
happy.gif
excited!

They already started painting the blocks! wohOOoo

Anyone will be staying at Blk 571C? 3ROOM?

Cheers!

Nisa
happy.gif
 
sorry for late response as i have not login here for quite some time..

alicia,
i haven joined fb group yet wor.. will take sometimes to look thru e archieve file n search for it.

completion is moved to q3 2012? i duno anything lei.. im like so mountain turtle..

btw, welcome Nisa..
happy.gif
 
saw an update from another forumer...

quoted: "As for update: This afternoon i went to check out the blocks. An uncle(also future resident) told me by next mth those blks that have been painted and windows up gonna be handover to hdb soon, as in next mth. Probably will get keys 1st or 2nd quater of 2012.was supposed to handover to hdb last mth(oct) but road got abit problem with big rocks.. Any of u receive this news yet?"

http://www.myhometown.sg/Forum/tabid/84/aff/290/aft/90939/afv/topic/afpg/56/Default.aspx
 
Hi Yang,

thank you for the updates!

Wow!! really? is that true? 1st or 2nd quarter?!?!
gosh!! im geting more and more excited yet nervous =/

still have not enough saving for reno =(

may I know what is woodlands champion courts facebook page name? i try to search it but still cant find it.

Cheers!

Nisa
 
Guys! I need ya'all opinions:

Is the following contract reasonable for 3 Rooms BTO Standard HDB Flat?

FLOORING FINISHES: Supply labour and material
- Homogeneous Flooring (Living/Dining/Store/Master Bedroom & Common Bedrrom) = $2,849.00
- Skirting at living/dining/store/master bedroom & common bedroom = FOC
-Level up at service yard and made good between kitchen and yard = $760.00

CONCRETE WORK - Supply labour and material
- Cabinet base, washing machine base and fridge base. = $320

PAINTING WORK - To supply labour and material
- ICI or Nippon Paint (5 colours) = $1,100.00

FIBROUS PLASTER WORK - To supply and material
- False ceiling at living, dining, passageway and master bedroom = $880.00

DOORS AND FRAMES - Design and construct as per drawing
- 1 set designer swing door at master bedroom = FOC
- 1 set of designer swing door at common bedroom = FOC

PLUMBING WORK, To supply labour and install
- Rerun copper pipe at kitchen = FOC
- Installation 1 of heater (tank type) = FOC
- Installation 1 set sink c/w tap at kitchen = FOC
- Installation of Accessories at Master bathroom = FOC
- Installation of Accessories at common bathroom = FOC

SHOWER SCREEN, To supply labour and install
- Tempered glass wall to wall at master bathroom = FOC

LIVING AREA
- Feature wall at house hold shelter 6.5ft = $1,100.00
- Feature wall at living 6ft = $1,080.00
- TV Console 6ft = $880.00

MASTER BEDROOM
- Wardrobe c/w sliding door 4.5ft = $1400
- Headboard c/w cushion half high 5ft = $600
- TV Feature wall 2ft = FOC

COMMON BEDROOM
- Wardrobe c/w sliding door 4ft = $1,120

KITCHEN
- Bottom cabinet 9.5ft =$1,045
- Top cabinet 9ft = $990
- Selected solid top 9.5ft = $760
- Aluminium frame c/w frosted glass = FOC
- ABS Trimming = FOC
- Dish rack = FOC
- Cutlery Tray = FOC
- PE endorsement between kitchen and yard = $416

OTHERS
- Haulage fees (uploading of sand/material and downloading of debris) = pay by owner
- Wash whole house with chemical & acid

GRAND TOTAL AMOUNT -------------> $15,300.00
 

Back
Top