Piper,
it's really nice to have a open concept. A pity that we can't as we need to leave the wall there. I think I will do without a door as I don't have the habit of opening and closing door of kitchen since mum & MIL's house do not have kitchen door
Mosaic,
I will do the sliding door outside the master toilet, so it will look like a big stretch
Really can't leave the wooden door there as it's too inconvenient to enter the shower area and the door almost touches the toilet bowl. Wonder how come HDB designers didn't think of that when they design our master toilet.
Vernon,
thank you. I went to my unit when there was a heavy rain before, seems alright
Mudpie,
hee... I was the one, glad that u asked for the doors and keys
Congrats on getting ur house keys! Hey, Sun I will be there but don't know what time yet. Do u want to email me ur hp no so that I can give u a msg when I know the time? My email is [email protected].
BB123,
to play safe, u may like to submit the defect list of the defects u have found on first check first. U can still submit another defect list if u see more
I'm doing it this way. After the first submission, I realise there are more defects after thorough checking, so I'm going to submit another one this weekend
it's really nice to have a open concept. A pity that we can't as we need to leave the wall there. I think I will do without a door as I don't have the habit of opening and closing door of kitchen since mum & MIL's house do not have kitchen door
Mosaic,
I will do the sliding door outside the master toilet, so it will look like a big stretch
Vernon,
thank you. I went to my unit when there was a heavy rain before, seems alright
Mudpie,
hee... I was the one, glad that u asked for the doors and keys
Congrats on getting ur house keys! Hey, Sun I will be there but don't know what time yet. Do u want to email me ur hp no so that I can give u a msg when I know the time? My email is [email protected].
BB123,
to play safe, u may like to submit the defect list of the defects u have found on first check first. U can still submit another defect list if u see more